Sunday, August 20, 2006
Finally, the conveyor system worked! It all started with a "drop-down" system which was totally scrapped. Then there's the horizontal system that needed loads of changes in design and modifications. It's really not easy to stick to an original plan man. Ask Wendy, she'll know! And really, many thanks to the uncle at Sim Lim Tower who helped us out so much. Yup, and of course, thanks to everyone for the cutting, the getting dirty, the cooking! (not to projecty stuff though), sweating, drawing, discussing, testing, thinking, planning, measuring, filing(wendy i never forget you hor), shopping and everything else! And of course we have to thank Mr VJ with his absolute trust in us which drove us to build a full working condition belt! OF course, Mr Chin's comments helped in many ways too.
Ahhahaha, much more work to do, much more changes and alterations. What to do...